Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0021062 Federal Type : NTNC
Water System Name : MSCVT WATER SYSTEM State Type : NTNC
Principal County Served : WASHINGTON Primary Source : GW
Status : A Activity Date : 09-08-2016

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RP DL 02-18-2026 02-25-2026 2/18 2/25 3100 COLIFORM (TCR)
3 RP DL 02-18-2026 02-25-2026 2/18 2/25 3100 COLIFORM (TCR)
3 TR MN 02-01-2026 02-28-2026 2/1 2/28 3100 COLIFORM (TCR)
1 RT QT 10-01-2024 01-31-2026 1/1 12/31 3100 COLIFORM (TCR)
1 RT MN 03-01-2026 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 5

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 5 RT 3Y 06-01-2024 to 09-30-2024 06-01-2027 to 09-30-2027
TP001 TREATMENT PLANT CCYN CDS FOR CYANIDE 1 RT 9Y Monitoring Completed 04-01-2034 to 06-30-2034
TP001 TREATMENT PLANT CFLU CDS FOR FLUORIDE 1 RT 9Y Monitoring Completed 04-01-2034 to 06-30-2034
TP001 TREATMENT PLANT CIOC CDS FOR INORGANICS 1 RT 9Y Monitoring Completed 04-01-2034 to 06-30-2034
TP001 TREATMENT PLANT CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 04-01-2027 to 06-30-2027
TP001 TREATMENT PLANT CIOS CDS FOR SECONDARIES 1 RT 3Y 04-01-2028 to 06-30-2028 04-01-2031 to 06-30-2031
TP001 TREATMENT PLANT CPFA CDS FOR ST PFAS 1 RT 3Y 01-01-2027 to 03-31-2027 01-01-2030 to 03-31-2030
TP001 TREATMENT PLANT CVOC CDS FOR VOC 1 RT 3Y 10-01-2028 to 12-31-2028 10-01-2031 to 12-31-2031
Total Number of Schedules Displayed = 8

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 3014 E. COLI 1 TG 1T 02-18-2026 to 02-25-2026 One Time Monitoring
Total Number of Schedules Displayed = 1

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
SOURCE PERMIT - OBTAIN FROM WSD 08-29-2016
CONSTRUCTION PERMIT APPLICATION-SUBMIT 07-11-2016
OPERATING PERMIT - APPLY FOR PERMIT 09-01-2016
CAPACITY DEVELOPMENT REVIEW - COMPLETE 09-08-2016
AS-BUILT DRAWINGS- SUBMIT 2016-11-11 12-19-2016
CONSTRUCTION PERMIT SATISFY CONDITIONS 2016-11-11 12-19-2016
ENGINEER CERTIFICATION - SUBMIT TO WSD 2016-11-11 12-19-2016
LEAD RESULTS NOTICE CERT 2018-12-29 12-29-2018
LEAD RESULTS NOTICE CERT 2019-12-29 12-29-2019
LEAD RESULTS NOTICE CERT 2020-12-29 12-29-2020
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2025-08-19
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
Total Number of Compliance Schedules Displayed = 12

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jul 27 11:43:45 EDT 2026