Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0021199 Federal Type : C
Water System Name : NOTCHBROOK III State Type : C
Principal County Served : LAMOILLE Primary Source : GW
Status : A Activity Date : 08-29-2008

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RP DL 04-24-2026 05-01-2026 4/24 5/1 3100 COLIFORM (TCR)
1 RT MN 10-01-2014 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 2

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 DISINFECTION 0999 CHLORINE 31 1 08-01-2023 SERD
TP001 DISINFECTION 1925 PH 31 0 06-06-2023
Total Number of Schedules Displayed = 2

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 1 RT 3Y 08-01-2027 to 08-31-2027 08-01-2030 to 08-31-2030
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 5 RT 3Y 06-01-2028 to 09-30-2028 06-01-2031 to 09-30-2031
TP001 DISINFECTION CCYN CDS FOR CYANIDE 1 RT 9Y 01-01-2023 to 03-31-2023 01-01-2029 to 03-31-2029
TP001 DISINFECTION CFLU CDS FOR FLUORIDE 1 RT 9Y 01-01-2023 to 03-31-2023 01-01-2029 to 03-31-2029
TP001 DISINFECTION CGA CDS FOR GROSS ALPHA 1 RT 6Y 07-01-2028 to 09-30-2028 07-01-2034 to 09-30-2034
TP001 DISINFECTION CIOC CDS FOR INORGANICS 1 RT 9Y 01-01-2023 to 03-31-2023 01-01-2029 to 03-31-2029
TP001 DISINFECTION CNO3 CDS FOR NITRATE 1 RT YR 07-01-2026 to 09-30-2026 07-01-2027 to 09-30-2027
TP001 DISINFECTION CTRA CDS FOR RADIUM 1 RT 6Y 07-01-2028 to 09-30-2028 07-01-2034 to 09-30-2034
TP001 DISINFECTION CIOS CDS FOR SECONDARIES 1 RT 3Y Monitoring Completed 01-01-2029 to 03-31-2029
TP001 DISINFECTION CSOC CDS FOR SOC 1 RT 3Y 07-01-2028 to 09-30-2028 07-01-2031 to 09-30-2031
TP001 DISINFECTION CPFA CDS FOR ST PFAS 1 RT 3Y 04-01-2026 to 06-30-2026 04-01-2029 to 06-30-2029
TP001 DISINFECTION CVOC CDS FOR VOC 1 RT 3Y 04-01-2028 to 06-30-2028 04-01-2031 to 06-30-2031
Total Number of Schedules Displayed = 12

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM 3014 E. COLI 1 TG 1T 04-24-2026 to 05-01-2026 One Time Monitoring
Total Number of Schedules Displayed = 1

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
LEAD RESULTS NOTICE CERT 2018-12-29 12-29-2018
CERTIFIED OPERATOR - OBTAIN OPERATOR 2019-12-08
LEAD RESULTS NOTICE CERT 2019-12-29 12-29-2019
LEAD RESULTS NOTICE CERT 2022-12-29 12-29-2022
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2026-05-24
LVL1 TTT MULTIPLE TC+ 2026-05-31 05-04-2026 05-06-2026
SOURCE - PROTECT FROM CONTAMINATION 2026-06-01
STORAGE OVERFLOW - PROVIDE ADEQUATE 2026-06-01
STORAGE TANK - INSTALL SCREENED VENT 2026-06-01 04-08-2026 04-08-2026
STORAGE - IMPROVE TANK COVER 2026-06-01
STORAGE TANK - CLEAN AND INSPECT 2026-06-01 03-19-2026 03-19-2026
SOURCE - IMPROVE POOR DRAINAGE 2026-06-01 04-08-2026 04-08-2026
CCR ISSUED 2026-07-01 04-20-2026 04-20-2026
CCR CERTIFICATION RECEIVED 2026-07-01 04-20-2026 04-20-2026
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
Total Number of Compliance Schedules Displayed = 15

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jul 27 01:32:50 EDT 2026