Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005010 Federal Type : C
Water System Name : VERGENNES PANTON WATER DISTRICT State Type : C
Principal County Served : ADDISON Primary Source : SW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
3 RP DL 08-05-2025 08-12-2025 8/5 8/12 3100 COLIFORM (TCR)
6 RT MN 01-01-2010 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 2

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 1 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 TREATMENT PLANT 1 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 TREATMENT PLANT 1 1044 ORTHOPHOSPHATE 31 0 10-26-2023
TP001 TREATMENT PLANT 1 0999 CHLORINE 31 1 07-01-2005 EPRD
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 95PT
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 MAXT
Total Number of Schedules Displayed = 6

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 2 RT QT 08-01-2025 to 08-31-2025 11-01-2025 to 11-30-2025
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 20 RT 3Y 06-01-2024 to 09-30-2024 06-01-2027 to 09-30-2027
TP001 TREATMENT PLANT 1 CCYN CDS FOR CYANIDE 1 RT 9Y 01-01-2031 to 03-31-2031 01-01-2036 to 03-31-2036
TP001 TREATMENT PLANT 1 CFLU CDS FOR FLUORIDE 1 RT 9Y Monitoring Completed 01-01-2036 to 03-31-2036
TP001 TREATMENT PLANT 1 CGA CDS FOR GROSS ALPHA 1 RT 9Y 01-01-2023 to 03-31-2023 01-01-2032 to 03-31-2032
TP001 TREATMENT PLANT 1 CIOC CDS FOR INORGANICS 1 RT 9Y 01-01-2031 to 03-31-2031 01-01-2036 to 03-31-2036
TP001 TREATMENT PLANT 1 CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2026 to 03-31-2026
TP001 TREATMENT PLANT 1 CTRA CDS FOR RADIUM 1 RT 9Y Monitoring Completed 07-01-2026 to 09-30-2026
TP001 TREATMENT PLANT 1 CIOS CDS FOR SECONDARIES 1 RT 3Y Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y Monitoring Partially Completed 04-01-2026 to 06-30-2026
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y Monitoring Partially Completed 07-01-2027 to 09-30-2027
TP001 TREATMENT PLANT 1 CVOC CDS FOR VOC 1 RT YR Monitoring Completed 04-01-2026 to 06-30-2026
TP001 TREATMENT PLANT 1 PFA5 PFAS - VT 5 SUM 1 RT 3Y 10-01-2023 to 12-31-2023 10-01-2026 to 12-31-2026
Total Number of Schedules Displayed = 13

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
AS-BUILT DRAWINGS- SUBMIT 2006-09-30
AS-BUILT DRAWINGS- SUBMIT 2006-11-30
AS-BUILT DRAWINGS- SUBMIT 2006-12-31
CONSTRUCTION PERMIT SATISFY CONDITIONS 2012-06-01
LEAD RESULTS NOTICE CERT 2020-12-29 12-29-2020
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2023-06-27 06-26-2023
SERVICE LINE NOTIFICATION CERTIFICATION 2025-07-01
CCR CERTIFICATION RECEIVED 2025-07-11 04-18-2025 04-18-2025
SERVICE LINE REPLACEMENT PLAN SUBMIT 2027-11-01
Total Number of Compliance Schedules Displayed = 9

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Fri Sep 05 17:52:46 EDT 2025