Return Links
Water
System Detail
Water
Systems
Water
System Search
County Map
Glossary
|
Sample and Compliance Schedules
| Water System No. : |
VT0005010 |
Federal Type : |
C |
| Water System Name : |
VERGENNES PANTON WATER DISTRICT |
State Type : |
C |
| Principal County Served : |
ADDISON |
Primary Source : |
SW |
| Status : |
A |
Activity Date : |
09-20-1989 |
|
TCR Schedules
| Sample
Count |
Sample
Type |
Sample
Frequency |
Effective
Begin
Date |
Effective
End
Date |
Seasonal
Start
MM/DD |
Seasonal
End
MM/DD |
Analyte
Code |
Analyte
Name |
| 3 |
RP |
DL |
08-05-2025
|
08-12-2025
|
8/5 |
8/12 |
3100 |
COLIFORM (TCR) |
| 6 |
RT |
MN |
01-01-2010
|
|
1/1 |
12/31 |
3100 |
COLIFORM (TCR) |
Total Number of Schedules Displayed = 2
Frequent Field Sample Schedules
| Water
System Facility State Asgn ID |
Water
System Facility Name |
Analyte
Code |
Analyte
Name |
Days
to Monitor per month |
Samples
Required per day |
Effective
Begin Date |
Effective
End Date |
Summary
Type |
| TP001 |
TREATMENT PLANT 1 |
1025 |
FLUORIDE |
31 |
1 |
07-25-2024
|
|
FLRD |
| TP001 |
TREATMENT PLANT 1 |
1025 |
FLUORIDE |
31 |
1 |
07-25-2024
|
|
FLRD |
| TP001 |
TREATMENT PLANT 1 |
1044 |
ORTHOPHOSPHATE |
31 |
0 |
10-26-2023
|
|
|
| TP001 |
TREATMENT PLANT 1 |
0999 |
CHLORINE |
31 |
1 |
07-01-2005
|
|
EPRD |
| TP001 |
TREATMENT PLANT 1 |
0100 |
TURBIDITY |
31 |
1 |
07-01-2005
|
|
95PT |
| TP001 |
TREATMENT PLANT 1 |
0100 |
TURBIDITY |
31 |
1 |
07-01-2005
|
|
MAXT |
Total Number of Schedules Displayed = 6
Non-TCR Group Schedules
| Water
System Facility State Asgn ID |
Water
System Facility Name |
Analyte
Group Code |
Analyte
Group Name |
Sample
Count |
Sample
Type |
Sample
Frequency |
Current Monitoring
Period Date Range |
Next Monitoring
Period Date Range |
|
DS001
|
DISTRIBUTION SYSTEM |
CDB2
|
CDS FOR DBP STAGE 2 |
2 |
RT |
QT |
08-01-2025 to 08-31-2025
|
11-01-2025 to 11-30-2025
|
|
DS001
|
DISTRIBUTION SYSTEM |
CL90
|
CDS FOR LEAD COPPER |
20 |
RT |
3Y |
06-01-2024 to 09-30-2024
|
06-01-2027 to 09-30-2027
|
|
TP001
|
TREATMENT PLANT 1 |
CCYN
|
CDS FOR CYANIDE |
1 |
RT |
9Y |
01-01-2031 to 03-31-2031
|
01-01-2036 to 03-31-2036
|
|
TP001
|
TREATMENT PLANT 1 |
CFLU
|
CDS FOR FLUORIDE |
1 |
RT |
9Y |
Monitoring Completed
|
01-01-2036 to 03-31-2036
|
|
TP001
|
TREATMENT PLANT 1 |
CGA
|
CDS FOR GROSS ALPHA |
1 |
RT |
9Y |
01-01-2023 to 03-31-2023
|
01-01-2032 to 03-31-2032
|
|
TP001
|
TREATMENT PLANT 1 |
CIOC
|
CDS FOR INORGANICS |
1 |
RT |
9Y |
01-01-2031 to 03-31-2031
|
01-01-2036 to 03-31-2036
|
|
TP001
|
TREATMENT PLANT 1 |
CNO3
|
CDS FOR NITRATE |
1 |
RT |
YR |
Monitoring Completed
|
01-01-2026 to 03-31-2026
|
|
TP001
|
TREATMENT PLANT 1 |
CTRA
|
CDS FOR RADIUM |
1 |
RT |
9Y |
Monitoring Completed
|
07-01-2026 to 09-30-2026
|
|
TP001
|
TREATMENT PLANT 1 |
CIOS
|
CDS FOR SECONDARIES |
1 |
RT |
3Y |
Monitoring Completed
|
01-01-2027 to 03-31-2027
|
|
TP001
|
TREATMENT PLANT 1 |
CSOC
|
CDS FOR SOC |
1 |
RT |
3Y |
Monitoring Partially Completed
|
04-01-2026 to 06-30-2026
|
|
TP001
|
TREATMENT PLANT 1 |
CSOC
|
CDS FOR SOC |
1 |
RT |
3Y |
Monitoring Partially Completed
|
07-01-2027 to 09-30-2027
|
|
TP001
|
TREATMENT PLANT 1 |
CVOC
|
CDS FOR VOC |
1 |
RT |
YR |
Monitoring Completed
|
04-01-2026 to 06-30-2026
|
|
TP001
|
TREATMENT PLANT 1 |
PFA5
|
PFAS - VT 5 SUM |
1 |
RT |
3Y |
10-01-2023 to 12-31-2023
|
10-01-2026 to 12-31-2026
|
Total Number of Schedules Displayed = 13
Non-TCR Individual Schedules
| Water
System Facility State Asgn ID |
Water
System Facility Name |
Analyte
Code |
Analyte
Name |
Sample
Count |
Sample
Type |
Sample
Frequency |
Current Monitoring
Period Date Range |
Next Monitoring
Period Date Range |
Total Number of Schedules Displayed = 0
Compliance Schedule
| Activity Name |
Activity Due Date |
Activity Projected Date |
Activity Achieved Date |
Activity Reported Date |
| AS-BUILT DRAWINGS- SUBMIT |
2006-09-30
|
|
|
|
| AS-BUILT DRAWINGS- SUBMIT |
2006-11-30
|
|
|
|
| AS-BUILT DRAWINGS- SUBMIT |
2006-12-31
|
|
|
|
| CONSTRUCTION PERMIT SATISFY CONDITIONS |
2012-06-01
|
|
|
|
| LEAD RESULTS NOTICE CERT |
2020-12-29
|
12-29-2020
|
|
|
| SOURCE PROTECTION PLAN - UPDATE AND SUBM |
2023-06-27
|
|
|
06-26-2023
|
| SERVICE LINE NOTIFICATION CERTIFICATION |
2025-07-01
|
|
|
|
| CCR CERTIFICATION RECEIVED |
2025-07-11
|
|
04-18-2025
|
04-18-2025
|
| SERVICE LINE REPLACEMENT PLAN SUBMIT |
2027-11-01
|
|
|
|
Total Number of Compliance Schedules Displayed = 9
Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”,
sufficient samples have been collected from the specified water system facility (WSF).
If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”,
sufficient samples have been collected for some but not all the analytes in the group.
A monitoring violation may occur if samples were not collected from the appropriate sampling point,
were not analyzed by a certified laboratory, or were not reported on time.
Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily
or weekly frequency will not display this message.
The Current Date and Time is: Fri Sep 05 17:52:46 EDT 2025
|