Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005017 Federal Type : C
Water System Name : NORTH BENNINGTON WATER DEPT State Type : C
Principal County Served : BENNINGTON Primary Source : SW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 01-01-1991 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 1 0999 CHLORINE 31 1 07-01-2005 EPRD
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 95PT
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 MAXT
Total Number of Schedules Displayed = 3

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 1 RT QT Monitoring Completed 08-01-2026 to 08-31-2026
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 10 RT 3Y 06-01-2026 to 09-30-2026 06-01-2029 to 09-30-2029
TP001 TREATMENT PLANT 1 CCYN CDS FOR CYANIDE 1 RT 9Y Monitoring Completed 07-01-2030 to 09-30-2030
TP001 TREATMENT PLANT 1 CFLU CDS FOR FLUORIDE 1 RT 9Y Monitoring Completed 07-01-2030 to 09-30-2030
TP001 TREATMENT PLANT 1 CGA CDS FOR GROSS ALPHA 1 RT 6Y 04-01-2028 to 06-30-2028 04-01-2034 to 06-30-2034
TP001 TREATMENT PLANT 1 CIOC CDS FOR INORGANICS 1 RT 9Y Monitoring Completed 07-01-2030 to 09-30-2030
TP001 TREATMENT PLANT 1 CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 04-01-2027 to 06-30-2027
TP001 TREATMENT PLANT 1 CTRA CDS FOR RADIUM 1 RT 9Y Monitoring Completed 01-01-2035 to 03-31-2035
TP001 TREATMENT PLANT 1 CIOS CDS FOR SECONDARIES 1 RT 3Y 07-01-2027 to 09-30-2027 07-01-2030 to 09-30-2030
TP001 TREATMENT PLANT 1 CPFA CDS FOR ST PFAS 1 RT 3Y 10-01-2027 to 12-31-2027 10-01-2030 to 12-31-2030
TP001 TREATMENT PLANT 1 CVOC CDS FOR VOC 1 RT 3Y Monitoring Completed 01-01-2029 to 03-31-2029
TP001 TREATMENT PLANT 1 PFA5 PFAS - VT 5 SUM 1 RT 3Y No Monitoring in Current Period No Monitoring After 12-31-2025
Total Number of Schedules Displayed = 12

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
LEAD RESULTS NOTICE CERT 2018-12-29 12-29-2018
LEAD RESULTS NOTICE CERT 2021-12-29 12-29-2021
CCR ISSUED 2026-07-01 03-30-2026 03-30-2026
CCR CERTIFICATION RECEIVED 2026-07-01 03-30-2026 03-30-2026
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2028-05-02
Total Number of Compliance Schedules Displayed = 6

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sat May 30 21:56:19 EDT 2026