Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005039 Federal Type : C
Water System Name : HARDWICK TOWN WATER SYSTEM State Type : C
Principal County Served : CALEDONIA Primary Source : GW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
2 RT MN 05-01-2007 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 1 0999 CHLORINE 31 1 07-01-2005 SERD
Total Number of Schedules Displayed = 1

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 1 RT YR 08-01-2026 to 08-31-2026 08-01-2027 to 08-31-2027
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 10 RT 3Y 06-01-2026 to 09-30-2026 06-01-2029 to 09-30-2029
TP001 TREATMENT PLANT 1 CCYN CDS FOR CYANIDE 1 RT 9Y 04-01-2023 to 06-30-2023 04-01-2029 to 06-30-2029
TP001 TREATMENT PLANT 1 CFLU CDS FOR FLUORIDE 1 RT 9Y 04-01-2023 to 06-30-2023 04-01-2029 to 06-30-2029
TP001 TREATMENT PLANT 1 CGA CDS FOR GROSS ALPHA 1 RT 6Y 01-01-2028 to 03-31-2028 01-01-2034 to 03-31-2034
TP001 TREATMENT PLANT 1 CIOC CDS FOR INORGANICS 1 RT 9Y 04-01-2023 to 06-30-2023 04-01-2029 to 06-30-2029
TP001 TREATMENT PLANT 1 CNO3 CDS FOR NITRATE 1 RT YR 10-01-2026 to 12-31-2026 10-01-2027 to 12-31-2027
TP001 TREATMENT PLANT 1 CTRA CDS FOR RADIUM 1 RT 9Y Monitoring Completed 01-01-2035 to 03-31-2035
TP001 TREATMENT PLANT 1 CIOS CDS FOR SECONDARIES 1 RT 3Y Monitoring Completed 04-01-2029 to 06-30-2029
TP001 TREATMENT PLANT 1 CPFA CDS FOR ST PFAS 1 RT YR 05-01-2026 to 07-31-2026 05-01-2027 to 07-31-2027
TP001 TREATMENT PLANT 1 CVOC CDS FOR VOC 1 RT 3Y 04-01-2026 to 06-30-2026 04-01-2029 to 06-30-2029
TP001 TREATMENT PLANT 1 PFA5 PFAS - VT 5 SUM 1 RT 3Y No Monitoring in Current Period No Monitoring After 12-31-2025
Total Number of Schedules Displayed = 12

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
O & M MANUAL - UPDATE AND SUBMIT 03-25-2011
AS-BUILT DRAWINGS- SUBMIT 2008-07-31
LEAD RESULTS NOTICE CERT 2018-12-29 12-29-2018
LEAD RESULTS NOTICE CERT 2021-12-29 12-29-2021
CERTIFY LEAD SL NOTIFICATION 2025-07-01
BOIL WATER 2026-04-22 04-27-2026
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2026-06-01 05-29-2026 05-26-2026
CERTIFY LEAD SL NOTIFICATION 2026-07-01
CCR ISSUED 2026-07-01 06-02-2026 06-03-2026
CCR CERTIFICATION RECEIVED 2026-07-01 06-03-2026 06-03-2026
CERTIFY LEAD SL NOTIFICATION 2027-07-01 07-01-2027
SERVICE LINE REPLACEMENT PLAN SUBMIT 2027-11-01
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2029-05-29
Total Number of Compliance Schedules Displayed = 14

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jun 08 17:04:45 EDT 2026