Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005130 Federal Type : C
Water System Name : ST ALBANS WATER DEPT State Type : C
Principal County Served : FRANKLIN Primary Source : SW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
10 RT MN 01-01-1991 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 MAQUAM TREATMENT PLANT 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 MAQUAM TREATMENT PLANT 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP002 FAIRFAX TREATMENT PLANT 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP002 FAIRFAX TREATMENT PLANT 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 MAQUAM TREATMENT PLANT 1044 ORTHOPHOSPHATE 31 0 10-26-2023
TP001 MAQUAM TREATMENT PLANT 1925 PH 31 0 10-26-2023
TP002 FAIRFAX TREATMENT PLANT 1044 ORTHOPHOSPHATE 31 0 10-26-2023
TP002 FAIRFAX TREATMENT PLANT 0999 CHLORINE 31 1 07-01-2005 EPRD
TP002 FAIRFAX TREATMENT PLANT 0100 TURBIDITY 31 1 07-01-2005 95PT
TP002 FAIRFAX TREATMENT PLANT 0100 TURBIDITY 31 1 07-01-2005 MAXT
TP001 MAQUAM TREATMENT PLANT 0999 CHLORINE 31 1 07-01-2005 EPRD
TP001 MAQUAM TREATMENT PLANT 0100 TURBIDITY 31 1 07-01-2005 95PT
TP001 MAQUAM TREATMENT PLANT 0100 TURBIDITY 31 1 07-01-2005 MAXT
Total Number of Schedules Displayed = 13

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CASB CDS FOR ASBESTOS 1 RT 9Y Monitoring Completed 10-01-2031 to 12-31-2031
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 4 RT QT 05-01-2026 to 05-31-2026 08-01-2026 to 08-31-2026
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 30 RT 3Y 06-01-2026 to 09-30-2026 06-01-2029 to 09-30-2029
IN002 FAIRFAX RESERVOIR CTOA CDS FOR TOC REMOVAL 1 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
TP001 MAQUAM TREATMENT PLANT CCYN CDS FOR CYANIDE 1 RT 9Y Monitoring Completed 07-01-2031 to 09-30-2031
TP001 MAQUAM TREATMENT PLANT CFLU CDS FOR FLUORIDE 1 RT 9Y Monitoring Completed 07-01-2031 to 09-30-2031
TP001 MAQUAM TREATMENT PLANT CGA CDS FOR GROSS ALPHA 1 RT 6Y 10-01-2031 to 12-31-2031 10-01-2037 to 12-31-2037
TP001 MAQUAM TREATMENT PLANT CIOC CDS FOR INORGANICS 1 RT 9Y Monitoring Completed 07-01-2031 to 09-30-2031
TP001 MAQUAM TREATMENT PLANT CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 MAQUAM TREATMENT PLANT CTRA CDS FOR RADIUM 1 RT 6Y 10-01-2031 to 12-31-2031 10-01-2037 to 12-31-2037
TP001 MAQUAM TREATMENT PLANT CIOS CDS FOR SECONDARIES 1 RT 3Y 07-01-2028 to 09-30-2028 07-01-2031 to 09-30-2031
TP001 MAQUAM TREATMENT PLANT CSOC CDS FOR SOC 1 RT 3Y 07-01-2027 to 09-30-2027 07-01-2030 to 09-30-2030
TP001 MAQUAM TREATMENT PLANT CSOC CDS FOR SOC 1 RT 3Y 04-01-2027 to 06-30-2027 04-01-2030 to 06-30-2030
TP001 MAQUAM TREATMENT PLANT CPFA CDS FOR ST PFAS 1 RT YR Monitoring Partially Completed 02-01-2027 to 02-28-2027
TP001 MAQUAM TREATMENT PLANT CPFA CDS FOR ST PFAS 1 RT YR 04-01-2026 to 06-30-2026 04-01-2027 to 06-30-2027
TP001 MAQUAM TREATMENT PLANT CVOC CDS FOR VOC 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 MAQUAM TREATMENT PLANT PFA5 PFAS - VT 5 SUM 1 RT 3Y No Monitoring in Current Period No Monitoring After 12-31-2025
TP002 FAIRFAX TREATMENT PLANT CCYN CDS FOR CYANIDE 1 RT 9Y Monitoring Completed 07-01-2031 to 09-30-2031
TP002 FAIRFAX TREATMENT PLANT CFLU CDS FOR FLUORIDE 1 RT 9Y Monitoring Completed 07-01-2031 to 09-30-2031
TP002 FAIRFAX TREATMENT PLANT CGA CDS FOR GROSS ALPHA 1 RT 6Y 10-01-2031 to 12-31-2031 10-01-2037 to 12-31-2037
TP002 FAIRFAX TREATMENT PLANT CIOC CDS FOR INORGANICS 1 RT 9Y Monitoring Completed 07-01-2031 to 09-30-2031
TP002 FAIRFAX TREATMENT PLANT CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP002 FAIRFAX TREATMENT PLANT CTRA CDS FOR RADIUM 1 RT 6Y 10-01-2031 to 12-31-2031 10-01-2037 to 12-31-2037
TP002 FAIRFAX TREATMENT PLANT CIOS CDS FOR SECONDARIES 1 RT 3Y 07-01-2028 to 09-30-2028 07-01-2031 to 09-30-2031
TP002 FAIRFAX TREATMENT PLANT CSOC CDS FOR SOC 1 RT 3Y 07-01-2027 to 09-30-2027 07-01-2030 to 09-30-2030
TP002 FAIRFAX TREATMENT PLANT CSOC CDS FOR SOC 1 RT 3Y 04-01-2027 to 06-30-2027 04-01-2030 to 06-30-2030
TP002 FAIRFAX TREATMENT PLANT CPFA CDS FOR ST PFAS 1 RT YR 04-01-2026 to 06-30-2026 04-01-2027 to 06-30-2027
TP002 FAIRFAX TREATMENT PLANT CVOC CDS FOR VOC 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP002 FAIRFAX TREATMENT PLANT PFA5 PFAS - VT 5 SUM 1 RT 3Y No Monitoring in Current Period No Monitoring After 12-31-2025
Total Number of Schedules Displayed = 29

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TP002 FAIRFAX TREATMENT PLANT 2920 CARBON, TOTAL 1 RT MN 06-01-2026 to 06-30-2026 07-01-2026 to 07-31-2026
Total Number of Schedules Displayed = 1

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
COMPLETE INITIAL LSL INVENTORY 05-28-2026
PUBLIC NOTICE - 30 DAYS 2025-01-05
CCR ISSUED 2026-07-01
CCR CERTIFICATION RECEIVED 2026-07-01
CERTIFY LEAD SL NOTIFICATION 2026-07-20
CERTIFY LEAD SL NOTIFICATION 2027-07-01 07-01-2027
SERVICE LINE REPLACEMENT PLAN SUBMIT 2027-11-01
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2029-02-13
Total Number of Compliance Schedules Displayed = 9

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Wed Jun 10 08:08:55 EDT 2026