Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005229 Federal Type : C
Water System Name : RUTLAND CITY WATER DEPT State Type : C
Principal County Served : RUTLAND Primary Source : SW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
20 RT MN 01-01-1991 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 1 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 TREATMENT PLANT 1 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 TREATMENT PLANT 1 1044 ORTHOPHOSPHATE 31 0 10-06-2023
TP001 TREATMENT PLANT 1 0999 CHLORINE 31 1 07-01-2005 EPRD
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 95PT
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 MAXT
Total Number of Schedules Displayed = 6

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CASB CDS FOR ASBESTOS 1 RT 9Y Monitoring Completed 01-01-2031 to 03-31-2031
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 4 RT QT 08-01-2026 to 08-31-2026 11-01-2026 to 11-30-2026
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 30 RT 3Y 06-01-2028 to 09-30-2028 06-01-2031 to 09-30-2031
TP001 TREATMENT PLANT 1 CCYN CDS FOR CYANIDE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CFLU CDS FOR FLUORIDE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CGA CDS FOR GROSS ALPHA 1 RT 9Y 01-01-2030 to 03-31-2030 01-01-2039 to 03-31-2039
TP001 TREATMENT PLANT 1 CIOC CDS FOR INORGANICS 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CTRA CDS FOR RADIUM 1 RT 9Y 01-01-2030 to 03-31-2030 01-01-2039 to 03-31-2039
TP001 TREATMENT PLANT 1 CIOS CDS FOR SECONDARIES 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y 04-01-2027 to 06-30-2027 04-01-2030 to 06-30-2030
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y Monitoring Partially Completed 01-01-2029 to 03-31-2029
TP001 TREATMENT PLANT 1 CPFA CDS FOR ST PFAS 1 RT YR Monitoring Partially Completed 02-01-2027 to 02-28-2027
TP001 TREATMENT PLANT 1 CPFA CDS FOR ST PFAS 1 RT YR Monitoring Partially Completed 04-01-2027 to 06-30-2027
TP001 TREATMENT PLANT 1 CVOC CDS FOR VOC 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
Total Number of Schedules Displayed = 15

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
AS-BUILT DRAWINGS- SUBMIT 2006-09-30
AS-BUILT DRAWINGS- SUBMIT 2007-11-30
O & M MANUAL - UPDATE AND SUBMIT 2007-11-30
AS-BUILT DRAWINGS- SUBMIT 2007-11-30
O & M MANUAL - UPDATE AND SUBMIT 2007-11-30
DBP SAMPLING PLAN 2013-10-01
PUBLIC NOTICE - 24 HOURS 2020-10-06
LEAD RESULTS NOTICE CERT 2022-12-29 12-29-2022
BOIL WATER 2026-06-01 06-03-2026
CERTIFY LEAD SL NOTIFICATION 2026-07-01 12-04-2025
CCR ISSUED 2026-07-01 05-29-2026 06-02-2026
CCR CERTIFICATION RECEIVED 2026-07-01 06-02-2026 06-02-2026
BOIL WATER 2026-07-08 07-09-2026
BOIL WATER 2026-07-27
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2026-08-25
CONSTRUCTION PERMIT APPLICATION-SUBMIT 2026-10-15
WATER SUPPLY PLAN -EXECUTE/MODIFY SYST. 2026-12-01
WATER SUPPLY PLAN -EXECUTE/MODIFY SYST. 2026-12-01
WATER SUPPLY PLAN -EXECUTE/MODIFY SYST. 2026-12-01
WATER SUPPLY PLAN -EXECUTE/MODIFY SYST. 2026-12-01
WATER SUPPLY PLAN -EXECUTE/MODIFY SYST. 2026-12-01
CERTIFY LEAD SL NOTIFICATION 2027-07-01 07-01-2027
CONSTRUCTION - COMPLETE 2027-08-01
CONSTRUCTION PERMIT SATISFY CONDITIONS 2027-10-01
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
SERVICE LINE REPLACEMENT PLAN SUBMIT 2027-11-01
Total Number of Compliance Schedules Displayed = 26

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Tue Jul 28 12:05:05 EDT 2026