Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005269 Federal Type : C
Water System Name : MARSHFIELD WATER SYSTEM State Type : C
Principal County Served : WASHINGTON Primary Source : GW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 04-01-2016 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
Total Number of Schedules Displayed = 0

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 5 RT 3Y 06-01-2024 to 09-30-2024 06-01-2027 to 09-30-2027
TP004 TREATMENT PLANT 4 - RESERVOIR CCYN CDS FOR CYANIDE 1 RT 3Y 10-01-2026 to 12-31-2026 10-01-2029 to 12-31-2029
TP004 TREATMENT PLANT 4 - RESERVOIR CFLU CDS FOR FLUORIDE 1 RT 3Y 10-01-2026 to 12-31-2026 10-01-2029 to 12-31-2029
TP004 TREATMENT PLANT 4 - RESERVOIR CGA CDS FOR GROSS ALPHA 1 RT YR 07-01-2026 to 09-30-2026 07-01-2027 to 09-30-2027
TP004 TREATMENT PLANT 4 - RESERVOIR CIOC CDS FOR INORGANICS 1 RT 3Y 10-01-2026 to 12-31-2026 10-01-2029 to 12-31-2029
TP004 TREATMENT PLANT 4 - RESERVOIR CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP004 TREATMENT PLANT 4 - RESERVOIR CTRA CDS FOR RADIUM 1 RT 6Y 07-01-2026 to 09-30-2026 07-01-2032 to 09-30-2032
TP004 TREATMENT PLANT 4 - RESERVOIR CIOS CDS FOR SECONDARIES 1 RT 3Y 10-01-2026 to 12-31-2026 10-01-2029 to 12-31-2029
TP004 TREATMENT PLANT 4 - RESERVOIR CSOC CDS FOR SOC 1 RT 3Y 10-01-2026 to 12-31-2026 10-01-2029 to 12-31-2029
TP004 TREATMENT PLANT 4 - RESERVOIR CPFA CDS FOR ST PFAS 1 RT YR Monitoring Partially Completed 05-01-2027 to 07-31-2027
TP004 TREATMENT PLANT 4 - RESERVOIR CVOC CDS FOR VOC 1 RT 3Y 07-01-2027 to 09-30-2027 07-01-2030 to 09-30-2030
Total Number of Schedules Displayed = 11

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
TP004 TREATMENT PLANT 4 - RESERVOIR 4006 COMBINED URANIUM 1 RT YR 10-01-2026 to 12-31-2026 10-01-2027 to 12-31-2027
Total Number of Schedules Displayed = 1

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
PUBLIC NOTICE - DO NOT DRINK 2007-07-15
PUBLIC NOTICE - BOIL WATER 2007-07-15
PUBLIC NOTICE - DO NOT DRINK 2007-10-15
LEAD RESULTS NOTICE CERT 2017-12-29 12-29-2017
LEAD RESULTS NOTICE CERT 2017-12-29 12-29-2017
LEAD RESULTS NOTICE CERT 2020-12-29 12-29-2020
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2021-06-23 01-29-2024
CCR ISSUED 2026-07-01
CCR CERTIFICATION RECEIVED 2026-07-01
CERTIFY LEAD SL NOTIFICATION 2026-07-01 11-26-2025
CERTIFY LEAD SL NOTIFICATION 2027-07-01 07-01-2027
SERVICE LINE REPLACEMENT PLAN SUBMIT 2027-11-01
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
Total Number of Compliance Schedules Displayed = 13

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jul 27 11:39:46 EDT 2026