Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005298 Federal Type : C
Water System Name : BELLOWS FALLS WATER DEPT State Type : C
Principal County Served : WINDHAM Primary Source : SW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
4 RT MN 10-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 1 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 TREATMENT PLANT 1 1025 FLUORIDE 31 1 07-25-2024 FLRD
TP001 TREATMENT PLANT 1 1925 PH 31 0 10-06-2023
TP001 TREATMENT PLANT 1 0999 CHLORINE 31 1 07-01-2005 EPRD
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 95PT
TP001 TREATMENT PLANT 1 0100 TURBIDITY 31 1 07-01-2005 MAXT
Total Number of Schedules Displayed = 6

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CASB CDS FOR ASBESTOS 1 RT 9Y Monitoring Completed 10-01-2030 to 12-31-2030
DS001 DISTRIBUTION SYSTEM CDB2 CDS FOR DBP STAGE 2 2 RT QT 08-01-2026 to 08-31-2026 11-01-2026 to 11-30-2026
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 20 RT 3Y 06-01-2024 to 09-30-2024 06-01-2027 to 09-30-2027
TP001 TREATMENT PLANT 1 CCYN CDS FOR CYANIDE 1 RT YR 07-01-2026 to 09-30-2026 07-01-2027 to 09-30-2027
TP001 TREATMENT PLANT 1 CFLU CDS FOR FLUORIDE 1 RT YR Monitoring Completed 07-01-2027 to 09-30-2027
TP001 TREATMENT PLANT 1 CGA CDS FOR GROSS ALPHA 1 RT 9Y 10-01-2032 to 12-31-2032 10-01-2041 to 12-31-2041
TP001 TREATMENT PLANT 1 CIOC CDS FOR INORGANICS 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CNO3 CDS FOR NITRATE 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CTRA CDS FOR RADIUM 1 RT 9Y 10-01-2032 to 12-31-2032 10-01-2041 to 12-31-2041
TP001 TREATMENT PLANT 1 CIOS CDS FOR SECONDARIES 1 RT YR Monitoring Completed 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y 01-01-2027 to 03-31-2027 01-01-2030 to 03-31-2030
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y 04-01-2028 to 06-30-2028 04-01-2031 to 06-30-2031
TP001 TREATMENT PLANT 1 CPFA CDS FOR ST PFAS 1 RT QT 07-01-2026 to 09-30-2026 10-01-2026 to 12-31-2026
TP001 TREATMENT PLANT 1 CVOC CDS FOR VOC 1 RT YR 07-01-2026 to 09-30-2026 07-01-2027 to 09-30-2027
Total Number of Schedules Displayed = 14

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
OPERATING PERMIT - APPLY FOR PERMIT 2015-07-01
LEAD RESULTS NOTICE CERT 2020-12-29 12-29-2020
CERTIFY LEAD SL NOTIFICATION 2026-07-01
CCR ISSUED 2026-07-01 03-30-2026 03-31-2026
CCR CERTIFICATION RECEIVED 2026-07-01 03-31-2026 03-31-2026
SOURCE PROTECTION PLAN - UPDATE AND SUBM 2027-04-03
CERTIFY LEAD SL NOTIFICATION 2027-07-01 07-01-2027 06-01-2026
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
Total Number of Compliance Schedules Displayed = 8

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Sun Jul 26 06:47:22 EDT 2026