Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : VT0005598 Federal Type : C
Water System Name : LEDGES SYSTEM 1 State Type : C
Principal County Served : WINDSOR Primary Source : GW
Status : A Activity Date : 09-20-1989

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 01-01-2015 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TREATMENT PLANT 1 1925 PH 31 0 06-08-2023
Total Number of Schedules Displayed = 1

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM CL90 CDS FOR LEAD COPPER 10 RT 6M 07-01-2026 to 12-31-2026 01-01-2027 to 06-30-2027
TP001 TREATMENT PLANT 1 CCYN CDS FOR CYANIDE 1 RT 9Y 04-01-2022 to 06-30-2022 04-01-2031 to 06-30-2031
TP001 TREATMENT PLANT 1 CFLU CDS FOR FLUORIDE 1 RT 9Y 04-01-2022 to 06-30-2022 04-01-2031 to 06-30-2031
TP001 TREATMENT PLANT 1 CGA CDS FOR GROSS ALPHA 1 RT 6Y 04-01-2028 to 06-30-2028 04-01-2034 to 06-30-2034
TP001 TREATMENT PLANT 1 CIOC CDS FOR INORGANICS 1 RT 9Y 04-01-2022 to 06-30-2022 04-01-2031 to 06-30-2031
TP001 TREATMENT PLANT 1 CNO3 CDS FOR NITRATE 1 RT YR 01-01-2026 to 03-31-2026 01-01-2027 to 03-31-2027
TP001 TREATMENT PLANT 1 CTRA CDS FOR RADIUM 1 RT 9Y 07-01-2032 to 09-30-2032 07-01-2041 to 09-30-2041
TP001 TREATMENT PLANT 1 CIOS CDS FOR SECONDARIES 1 RT 3Y 01-01-2027 to 03-31-2027 01-01-2030 to 03-31-2030
TP001 TREATMENT PLANT 1 CSOC CDS FOR SOC 1 RT 3Y 01-01-2028 to 03-31-2028 01-01-2031 to 03-31-2031
TP001 TREATMENT PLANT 1 CPFA CDS FOR ST PFAS 1 RT 3Y 04-01-2028 to 06-30-2028 04-01-2031 to 06-30-2031
TP001 TREATMENT PLANT 1 CVOC CDS FOR VOC 1 RT 3Y 07-01-2026 to 09-30-2026 07-01-2029 to 09-30-2029
Total Number of Schedules Displayed = 11

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
Total Number of Schedules Displayed = 0

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
COMPLETE INITIAL LSL INVENTORY 05-22-2026
OPERATING PERMIT - APPLY FOR PERMIT 2015-09-01
STANDBY POWER ? INSTALL 2017-12-31
LEAD RESULTS NOTICE CERT 2018-12-29 12-29-2018
LEAD RESULTS NOTICE CERT 2021-12-29 12-29-2021
MONTHLY REPORTING - SUBMIT REPORTS 2022-02-10 04-27-2023
STANDBY POWER ? INSTALL 2022-03-01 04-27-2023
STORAGE TANK - CLEAN AND INSPECT 2025-10-31
CORROSION CONTROL TRT OPTIMIZE 2025-12-31
CCR ISSUED 2026-07-01 06-23-2026 06-23-2026
CCR CERTIFICATION RECEIVED 2026-07-01 06-23-2026 06-23-2026
LEAD RESULTS NOTICE CERT 2026-09-28 09-28-2026
SUBMIT BASELINE SERVICE LINE INVENTORY 2027-11-01 11-01-2027
Total Number of Compliance Schedules Displayed = 13

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon Jul 27 20:34:39 EDT 2026